"Today, March 13th, the connection between the future Santos station and the new Rato/Santos tunnel became a reality with the demolition of the tympanum that separated the new Santos station from this new tunnel. The Rato, Estrela and Santos stations are already connected".
The Metro ensures that the "work on the future Santos station is progressing at a good pace", and the "excavation of the central nave of the station, which is located in the space of the Firefighters Sapadores Regiment Barracks, is in the final stretch of completion".